ASP Contracting were contracted by Sherring Constructions to design and install additional sheet piling required for the Tallebudgera drive river frontage.
ASP Contracting were contracted by Sherring Constructions to design and install additional sheet piling required for the Tallebudgera drive river frontage.
ASP Contracting completed a design, pre-drilling and sheet piling of the Mount Crosby road Colleges Crossing bridge for BMD Constructions. The Bridge crosses the Brisbane river located at Churwar. ASP Contracting Installed 85 Lineal Meters of Sheet pile for the bridge holding back the force of the Brisbane river.
ASP Contracting Completed a design, pre-drilling, sheet piling and anchoring of over 30 lineal meters of Sheet pile for the Gasworks Newstead. Newstead is an area for future growth with the Gasworks Shopping Centre being the center piece surrounded by developing apartment buildings.
ASP Contracting have completed work for H.Troon. PTY. LTD. for installation of sheet pile for 12 lineal meters, bracing and size adjustment of sheets for the new Bunnings at Labrador, QLD.
ASP Contracting have completed work for Hutchinson Builders with installation of bored pier piles for Peninsula Fair Shopping Centre’s foundations and Kippa Ring.
Australian Dewatering Systems dewatered the basement for this development on the Gold Coast using a Spear-point system, whilst ASP Contracting used their sheet piling system for basement retention. We also used our filtration equipment to ensure the water leaving the site met local environmental requirements for groundwater discharge.
The Isle of Capri shopping centre required dewatering throughout the construction process. The discharged water required filtration and treatment including the use of sedimentation tanks, pH filtration, odour suppressant and Sedi Sparge equipment. We also monitored the discharge 24 hours a day for this site. Our Piling arm also used a sheet system during the construction of this project.