Project Description
Australian Dewatering Systems dewatered the basement for this development on the Gold Coast using a Spear-point system, whilst ASP Contracting used their sheet piling system for basement retention. We also used our filtration equipment to ensure the water leaving the site met local environmental requirements for groundwater discharge.


