At the Cairns Hospital redevelopment site, Australian Dewatering Systems used a spear pump system. We monitored the discharge water to ensure it would be compliant, which meant chemicals, filtration and sedimentation equipment were also required.

At the Cairns Hospital redevelopment site, Australian Dewatering Systems used a spear pump system. We monitored the discharge water to ensure it would be compliant, which meant chemicals, filtration and sedimentation equipment were also required.
Australian Dewatering Systems dewatered the basement for this development on the Gold Coast using a Spear-point system, whilst ASP Piling used their sheet piling system for basement retention. We also used our filtration equipment to ensure the water leaving the site met local environmental requirements for groundwater discharge.
This residential project used a Spear System to dewater the site throughout the construction of the underground basement. Ensuring the water quality of the discharge, we used filtration and sedimentation equipment and ensured monitoring of the water discharged was undertaken.
The Isle of Capri shopping centre required dewatering throughout the construction process. The discharged water required filtration and treatment including the use of sedimentation tanks, pH filtration, odour suppressant and Sedi Sparge equipment. We also monitored the discharge 24 hours a day for this site. Our Piling arm also used a sheet system during the construction of this project.