Noosa Heads Residence

We are nearing competition on this residential basement. Based on the Noosa River, this job involved 147 L/m of Cantilevered Sheet Piling, Internal Bracing, Spear Point Dewatering and Groundwater Treatment.

This is the third property in this street ASP has successfully performed these works on.