Built by Rapcivic Constructions in Surfers Paradise, Queensland.

This development required shoring by ASP Piling to construct a two level basement.

Whilst anchored sheet piling was used, a small portion of this job had to be restrained using internal propping.

All sheet piling work was carried out by Australian Sheet Piling with all dewatering handled by sister company Australian Dewatering Systems.

Cudgen Surf Club Secant Wall

Cudgen Surf Club Secant Wall

ASP built a secant wall to combat erosion at the Cudgen Surf Life Saving Club at Kingscliffe, NSW. This stretch of coastline has suffered severe erosion, resulting in the loss of a beachfront road not far from the surf club.

The overlapping concrete piles that form a Secant Pile Wall create a watertight wall which eliminates issues of scouring caused by tides and weather and provides a sound base/foundation to protect buildings and other infrastructure from being undermined.

This project for the Tweed Shire Council took from May to August 2010.

The Cudgen SLSC secant wall was also tied back to a secondary reinforced concrete footing using connecting anchors.

When high seas again threatened the foreshore, the surf club’s secant wall weathered the storm.

Coast 2 in Labrador

ASP Piling has completed a design, pre drilling and sheet piling for Stokes Wheeler site Coast 2 in Labrador. It appears the site is stage one of a bigger development and ASP Piling are hoping to continue their work on the project.

Rhapsody Surfers Paradise

Multiplex site Rhapsody. Rhapsody located on the old Red Rooster site in Surfers Paradise was hot property after the reduction of track size for the GC600 and this completing on the Gold Coast Light Rail, the building features studio apartments for university students right up to penthouse suits for the businessman getaway.

ASP Piling have completed a design, pre-drilling and installation of 2015 lineal meters of sheet pile for the Brookfield.

Brisbane Airport

ASP Piling was involved in the airside works for the pipeline extension and relocation of the jet A-1 fuel lines to bay 72 & 73. Our works included the installation of sheet piling and dewatering spears to 15 bell holes including a 3.5 meter excavation for the hydrant pit to facilitate the installation of the pipeline.

Our ground water treatment included PH adjustment and sedimentation with full compliance to al BAC technical and environmental guidelines.

Sanbano in Coolangatta

ASP Piling have completed works for Eastview for a design, pre-drilling and sheet piling for Sanbano in Coolangatta. The beach front tower 96 CFA Piles for its double basement on Coolangatta’s esplanade.

Remora Road Apartments

ASP Piling has completed works for design, pre-drilling and sheet pile installation of 456 lineal meters for Forest Meier’s Construction along their Remora Road site in Hamilton, Brisbane.

Hamilton Reach

ASP has completed design, pre-drilling for 70 lineal meters and installed 45 lineal meters of sheet piles for Australand in Brisbane’s Hamilton Harbour.

Isle of Capri via Roma

ASP Piling has been contracted by Hutchinson Builders to design, pre-drill, sheet pile and anchor for the Isle of Capri Via Roma complex. This Redevelopment has created a Shopping Centre hub for the residents of Isle of Capri.