Project Description

Australian Dewatering Systems dewatered the basement for this development on the Gold Coast using a Spear-point system, whilst ASP Piling used their sheet piling system for basement retention. We also used our filtration equipment to ensure the water leaving the site met local environmental requirements for groundwater discharge.

Project Details